mirror of https://github.com/apache/jmeter.git
Change scheduler reference in Thread Group documentation
Contributed by Ori Marko Bugzilla Id: 64960
This commit is contained in:
parent
71fbfafb85
commit
f508df4dbb
|
|
@ -156,6 +156,7 @@ Summary
|
|||
|
||||
<h3>Documentation</h3>
|
||||
<ul>
|
||||
<li><bug>64960</bug>Change scheduler reference in Thread Group documentation. Contributed by Ori Marko</li>
|
||||
</ul>
|
||||
|
||||
<h3>General</h3>
|
||||
|
|
@ -169,6 +170,7 @@ Summary
|
|||
<p>We thank all contributors mentioned in bug and improvement sections above:
|
||||
</p>
|
||||
<ul>
|
||||
<li>Ori Marko (orimarko at gmail.com)</li>
|
||||
</ul>
|
||||
<p>We also thank bug reporters who helped us improve JMeter.</p>
|
||||
<ul>
|
||||
|
|
|
|||
|
|
@ -82,20 +82,14 @@ Start with Ramp-up = number of threads and adjust up or down as needed.
|
|||
|
||||
<p>By default, the thread group is configured to loop once through its elements.</p>
|
||||
|
||||
<p>Thread Group also provides a <b>scheduler</b>.
|
||||
<p>Thread Group also allows to specify <b>Thread lifetime</b>.
|
||||
Click the checkbox at the bottom of the Thread Group panel to enable/disable extra fields
|
||||
in which you can enter the duration of test, the startup delay, the start and end times of the run.
|
||||
in which you can enter the duration of test and the startup delay
|
||||
You can configure <code>Duration (seconds)</code> and <code>Startup Delay (seconds)</code> to control
|
||||
the duration of each thread group and the after how much seconds it starts.
|
||||
When the test is started, JMeter will wait <code>Startup Delay (seconds)</code> before starting the Threads
|
||||
of the Thread Group and run for the configured <code>Duration (seconds)</code> time.
|
||||
Note those 2 options override the <code>Start time</code> and <code>End time</code>.
|
||||
|
||||
<p>Alternatively (although not recommended as not very flexible) you can use the two other fields <code>Start time</code> and <code>End time</code>.
|
||||
When the test is started, JMeter will wait if necessary until the start-time has been reached.
|
||||
At the end of each cycle, JMeter checks if the end-time has been reached, and if so, the run is stopped,
|
||||
otherwise the test is allowed to continue until the iteration limit is reached.</p>
|
||||